Loading Projects
Load a saved project to restore your entire production setup instantly.
Restoring your last session
If the app closes while you have a session in progress — a crash, a force-quit, or iPadOS reclaiming memory — pMix.studio offers to pick up where you left off. On the next launch, a restore prompt appears with your last session; accept it to bring back your sources, scenes, and mixer state, or dismiss it to start fresh. Nothing is restored without your say-so.
If the app didn’t shut down cleanly, the offer comes back on the next launch too — dismissing it once during a panic doesn’t lose the session. If you’d rather not be asked, there’s a toggle to suppress the prompt, and the same toggle brings it back.
How to load
- Open Settings → Project
- Browse your saved projects — each shows a cover thumbnail of what the production looked like, so you can find one by eye rather than by name
- Select the project to load
- Tap Load
- Your production state is restored
What happens on load
When you load a project:
- All source slots are configured with their saved sources, in the grid order you left them in
- Scenes are recreated with their layer assignments
- Audio levels, mute states, and routing are restored — including for a slot whose source wasn’t reachable at load time, so its levels come back when the source does
- Transition settings are applied, including which transition you had selected
- Streaming configuration (platform, key, bitrate) is restored
- Overlay content and positions are set up
Network sources
Sources that depend on network connectivity (NDI, iPhone cameras) will attempt to reconnect:
- NDI sources — pMix.studio rediscovers them on the network. If the same NDI source is available, it reconnects automatically
- iPhone cameras — The pMix Camera app needs to be running on the iPhone. The iPad will attempt to reconnect
If a network source isn’t available when the project loads, its slot shows an error state until the source comes online.
Transitioning between projects
Loading a new project replaces the current state entirely. If you want to preserve your current setup:
- Save the current state as a project first
- Then load the new project
Tips
- Pre-show routine — Load your project 15–30 minutes before showtime to allow network sources time to reconnect
- Verify after loading — Check that all sources are connected, audio levels are correct, and overlays look right
- Stream keys — Stream keys are saved with the project. If your platform uses rotating keys (e.g., Facebook), update the key after loading